Bittern Primary School

Classroom Renovation - Primary School


Our journey with Bittern Primary School began with a comprehensive, full-campus masterplan in late 2022. We are excited to share that Stage 1 of that masterplan - renovating the old library into a new learning neighbourhood commence construction in early 2024.

Here is a quick sneak peek of their new, double classroom with connected staff workroom and small group room.

Site plan of an existing school campus including an oval, play equipment, garden, parking, and various buildings labeled for multifunctional use and administration.
Modern open-plan double classroom interior with wooden shelves, plants, and a geometric ceiling design.
Before: Black and white image of the interior of a library with bookshelves and two blurred people
Illustration of a bird next to photos of a billabong, wetlands, and beach landscape.
Assorted colored carpet squares, including shades of blue, beige, green, and brown, arranged in a grid layout.

Inspired by the Bittern Bird and local surrounds

An earthy material pallet with lightly colourful highlights

Modern open-plan double classroom with tables, chairs, and exposed wooden beams. A stylised tree is created with a timber column and green acoustic battens on the ceilng.

Various acoustic treatments are retrofitted to the walls and ceiling of this existing structure - enhancing the character of the space whilst creating an inclusive learning environment.

Autex Panels